Wuppertal Construction | Phase 2: Module Structure
Tuesday was the most exciting day of the set-up for us. All our modules (3 interior modules, 1 terrace element, and 4 roof modules) were delivered to the solar campus in close time and assembled and arranged in intensive cooperation with the carpenters. Despite the rainy and cold weather, the assembly went as planned and we were able to put everything together as planned. Our HDU stood at the end of the day!